enlx.jpg

Pingxian Intelligent Equipment (Shenzhen) Co., Ltd

Contact:Manager Liu

Tel:+86-755-28182129

Email:linda-liu@pxkj.com

Web:www.pxkj.com.cn

Add:No. 20, Liguang New Industrial Zone, Longhua New District, Shenzhen, Guangdong, China

Daily maintenance and maintenance of automatic laminating machine

Issuing time:2021-06-09 21:39


平显光电设备宣传片-英文.mp4.Still023.jpg


Laminating machine daily before starting

1. Before powering on the machine every day, check whether there are sundries on the lamination machine, such as wrenches and screwdrivers.

2. Check whether the power supply is normal and whether the power cable is damaged.

3. Nothing can fall into the machine, or it will break down.

4. The machine should not work in the humid, dusty and polluted environment, so as not to shorten the service life of the product.


Automatic laminating machine working process


By artificial (mechanical) products to be included in the positioning fixture, transmission platform products into the next station to homework, homework finished, the current location products automatically into the next station again or other operations, the entire product, after the completion of all assignments in one location, artificial (mechanical) will automatically take the product to the specified location. Equipment action cycle, continuous operation!


Laminating machine every day before the end of work

1. Before leaving work every day, turn off the power and do the following:

2. Clean the machine. Wipe the outer surface of the machine with a dry soft cloth.

3. If the film machine is stained with sticky substances, it can be wiped with a dry wet cloth.

4. When wiping, pay attention to observe whether there are loose screws on the machine. If there are loose places, tighten them immediately.


Regular maintenance of laminating machine

1. Clean and dust removal once a week.

2. After the machine continues to work every other week, stabilize each wiring terminal of the machine to prevent bad contact and other phenomena.

3. Pay attention to check whether the motor wire peeling phenomenon, if so, please replace the wire immediately to prevent short circuit and electric shock accidents.

4. Screw guide rail with lubricating oil maintenance, operation every 3 months.





Service
 
 
——————
Telephone
Contact:Manager Liu Tel:+86-755-28182129
‍Please add wechat